21 March 2026

10 million allocated to repair road surface in Izmail industrial zone

(PHOTO: Intent/Antonina Lubchenko)

The Housing and Communal Services Department of the Izmail City Council has announced an open tender with specific requirements to find a contractor for the current repair of the road surface on Sudoremontnikov Street in Izmail.

As Intent's correspondent reported, this is the direction of traffic to the city's port facilities and transshipment points. The relevant information was published in the Prozorro system.

Funding will come from the local budget. The expected cost of the works is over UAH 10.2 million. Sudoremontnikov Street (formerly Artema Street) is one of the key transport arteries of the industrial zone of Izmail. It provides access to the port infrastructure, so it is heavily used by freight transport. The total length of the street is about 1.5 kilometers, but only some of the most worn-out sections are planned to be repaired under this tender.

According to the technical specification, a set of emergency road works is envisaged. In particular, the contractor is to perform cold milling of the asphalt concrete pavement over an area of about 4,000 square meters with a depth of up to 5 centimeters. After that, it is planned to treat the surface with bituminous materials to improve the adhesion of the layers.
The next stage will be the installation of a leveling layer of coarse-grained asphalt concrete. The work will be performed using an asphalt paver, which will ensure the pavement is smooth and durable even under heavy traffic load.

The roadsides will be strengthened using asphalt granulate up to 10 centimeters thick. This should increase the road's resistance to destruction and prevent the edges of the roadway from sinking.

The auction is scheduled for March 26. The deadline for completion is June 30 this year. It should be added that over the past six months, the city has twice invested in the repair of the road on Sudoremontnikov Street for a total of UAH 374.3 thousand. The works were carried out by Izmailagroshlyakhbud (last fall) and SMU-56 (to be completed by March 27, 2026).

Антоніна Лубченко

You may also like:

July 8, 2026

In Odesa, the case of a lawyer who tried to profit from both the government and his client has been referred to court

The Anti-Corruption Court has resumed proceedings in the case of a judge from Odesa

Izmail has joined the declaration on cooperation among communities in southern Odesa Oblast

An MP from Odesa ranked second in terms of income within his faction

Izmail has transferred Ukrzaliznytsia's water supply networks to municipal ownership

Mykolaivvodokanal and the Port of "Pivdennyi" Have Been Designated as Monopolies

In the Odesa region, 10 men were caught trying to smuggle 10 men out of the country disguised as furniture

A girl who was swept out to sea in June was found dead

The TOP 20 Effect: How a Single Honest Review Can Change the Fate of a Local Business Advertisement

The director of the Odessa Museum of History and Local Lore has died

The Odessa City Council session was adjourned before it even began

The Time-Squeeze Trap: Why We Overpay Because of Haste, Not Because of Price Tags Advertisement

In Odessa, a man took people hostage at a hair salon

The number of people injured in the rocket attack in Odesa has reached ten

July 7, 2026

A security official from Transnistria was convicted in Odesa for attempting to recruit an SBU employee